Hydroquest
Hydroquest River 2.80 tidal turbine tested
in Bordeaux from 2018 to 2019

Hydroquest River 2.80

Type of support:
barge flottante

Unit power:
80 kW

Dimension:
5m d’arrête

Anchoring:
pieux ou lignes d’amarrage

Weight:
6t

Site Hydroquest

Thomas Jaquier

Président Directeur Général

« SEENEOH enables technology developers to test their technology very quickly in real conditions, with very strong support from the test site partners. There is a great deal of fluidity in the deployment of the project thanks to the availability of all the local skills required for the turbine installation and testing operations. The installations are immediately operational and the absence of permitting means that deployment can proceed very quickly. Turbine upgrades can easily be carried out directly on site. »

Actualités

Publié le 17/05/2023

Créée par décret publié au Journal Officiel le

En savoir plus